Downtime Monitoring
30-day analysis across all equipment
Total Downtime
822h
200 events
Unplanned
445h
54% of total
Avg Duration
247 min
Per event
Top Offender
LoadMaster Dryer
56h total
By Reason
Daily Trend
Top Offenders
Recent Downtime Events
| Device | Reason | Start | Duration | Shift | Comment |
|---|---|---|---|---|---|
T50 Central Granulator #46 Racine Extrusion Facility | Electrical Fault | Feb 28 06:37 AM | 6h 46m | night | Operator break — no coverage |
EcoFlow Energy Monitor #24 Dayton Manufacturing | Material Changeover | Feb 28 04:59 AM | 1h 30m | night | Electrical fault traced to loose connection on contactor |
T50 Central Granulator #49 Joliet Production Site | Material Changeover | Feb 28 01:38 AM | 2h 55m | night | Cleaned material buildup in feed throat |
GH-F Gravimetric Feeder #9 Elkhart Production Center | Quality Hold | Feb 28 01:10 AM | 3h 51m | night | — |
GP Portable Chiller #13 Louisville Assembly | Scheduled Maintenance | Feb 27 11:44 PM | 2h 42m | evening | — |
GP Portable Chiller #37 Grand Rapids Plant | Material Changeover | Feb 27 10:23 PM | 3h 31m | evening | Quality issue — calibrating sensors |
Accumeter Ovation Continuous Blender #51 Joliet Production Site | Electrical Fault | Feb 27 10:15 PM | 1h 15m | evening | Operator break — no coverage |
GP Portable Chiller #13 Louisville Assembly | Material Changeover | Feb 27 08:28 PM | 2h 12m | evening | Quality issue — calibrating sensors |
VTC Plus Conveying System #34 Grand Rapids Plant | Electrical Fault | Feb 27 07:41 PM | 38m | evening | — |
GH-F Gravimetric Feeder #45 Racine Extrusion Facility | Electrical Fault | Feb 27 03:41 PM | 1h 30m | day | Cleaned material buildup in feed throat |
T50 Central Granulator #49 Joliet Production Site | Mechanical Failure | Feb 27 02:46 PM | 5h 44m | day | Quality issue — calibrating sensors |
BD Batch Blender #12 Louisville Assembly | Material Changeover | Feb 27 01:09 PM | 1h 5m | day | — |
T50 Central Granulator #49 Joliet Production Site | Mold Change | Feb 27 12:45 PM | 1h 35m | day | Color change — purging system |
HE Central Chiller #27 Dayton Manufacturing | Electrical Fault | Feb 27 11:11 AM | 2h 11m | day | Scheduled PM — oil change and filter replacement |
T50 Central Granulator #50 Joliet Production Site | Scheduled Maintenance | Feb 27 10:40 AM | 52m | day | Operator break — no coverage |
GP Portable Chiller #37 Grand Rapids Plant | Scheduled Maintenance | Feb 27 04:13 AM | 4h 44m | night | Color change — purging system |
GP Portable Chiller #13 Louisville Assembly | Mold Change | Feb 27 03:20 AM | 5h 33m | night | Electrical fault traced to loose connection on contactor |
TS5 TCU #8 Elkhart Production Center | Quality Hold | Feb 27 03:19 AM | 6h 1m | night | Cleaned material buildup in feed throat |
VTC Plus Conveying System #3 Elkhart Production Center | Mold Change | Feb 27 02:46 AM | 1h 42m | night | Electrical fault traced to loose connection on contactor |
LoadMaster Dryer #20 Louisville Assembly | Electrical Fault | Feb 27 02:01 AM | 1h 35m | night | Scheduled PM — oil change and filter replacement |
T50 Central Granulator #47 Racine Extrusion Facility | Scheduled Maintenance | Feb 26 10:55 PM | 2h 25m | evening | Cleaned material buildup in feed throat |
EcoFlow Energy Monitor #44 Racine Extrusion Facility | Electrical Fault | Feb 26 10:25 PM | 1h 36m | evening | Replaced worn bearing on main drive |
BD Batch Blender #17 Louisville Assembly | Mechanical Failure | Feb 26 08:01 PM | 2h 27m | evening | Color change — purging system |
GP Portable Chiller #29 Dayton Manufacturing | Quality Hold | Feb 26 07:27 PM | 4h 12m | evening | Operator break — no coverage |
BD Batch Blender #48 Racine Extrusion Facility | Operator Unavailable | Feb 26 04:48 PM | 7h 54m | evening | Operator break — no coverage |
EcoFlow Energy Monitor #52 Joliet Production Site | Mold Change | Feb 26 04:12 PM | 6h 30m | evening | Cleaned material buildup in feed throat |
Accumeter Ovation Continuous Blender #19 Louisville Assembly | Mold Change | Feb 26 01:45 PM | 3h 59m | day | Color change — purging system |
T50 Central Granulator #49 Joliet Production Site | Scheduled Maintenance | Feb 26 10:52 AM | 3h 5m | day | Cleaned material buildup in feed throat |
VTC Plus Conveying System #11 Elkhart Production Center | Material Changeover | Feb 26 07:58 AM | 7h 40m | night | — |
HE Central Chiller #27 Dayton Manufacturing | Material Changeover | Feb 26 07:50 AM | 4h 55m | night | Operator break — no coverage |