Total Downtime

822h

200 events

Unplanned

445h

54% of total

Avg Duration

247 min

Per event

Top Offender

LoadMaster Dryer

56h total

By Reason

Daily Trend

Top Offenders

Recent Downtime Events

DeviceReasonStartDurationShiftComment

T50 Central Granulator #46

Racine Extrusion Facility

Electrical FaultFeb 28 06:37 AM6h 46mnightOperator break — no coverage

EcoFlow Energy Monitor #24

Dayton Manufacturing

Material ChangeoverFeb 28 04:59 AM1h 30mnightElectrical fault traced to loose connection on contactor

T50 Central Granulator #49

Joliet Production Site

Material ChangeoverFeb 28 01:38 AM2h 55mnightCleaned material buildup in feed throat

GH-F Gravimetric Feeder #9

Elkhart Production Center

Quality HoldFeb 28 01:10 AM3h 51mnight

GP Portable Chiller #13

Louisville Assembly

Scheduled MaintenanceFeb 27 11:44 PM2h 42mevening

GP Portable Chiller #37

Grand Rapids Plant

Material ChangeoverFeb 27 10:23 PM3h 31meveningQuality issue — calibrating sensors

Accumeter Ovation Continuous Blender #51

Joliet Production Site

Electrical FaultFeb 27 10:15 PM1h 15meveningOperator break — no coverage

GP Portable Chiller #13

Louisville Assembly

Material ChangeoverFeb 27 08:28 PM2h 12meveningQuality issue — calibrating sensors

VTC Plus Conveying System #34

Grand Rapids Plant

Electrical FaultFeb 27 07:41 PM38mevening

GH-F Gravimetric Feeder #45

Racine Extrusion Facility

Electrical FaultFeb 27 03:41 PM1h 30mdayCleaned material buildup in feed throat

T50 Central Granulator #49

Joliet Production Site

Mechanical FailureFeb 27 02:46 PM5h 44mdayQuality issue — calibrating sensors

BD Batch Blender #12

Louisville Assembly

Material ChangeoverFeb 27 01:09 PM1h 5mday

T50 Central Granulator #49

Joliet Production Site

Mold ChangeFeb 27 12:45 PM1h 35mdayColor change — purging system

HE Central Chiller #27

Dayton Manufacturing

Electrical FaultFeb 27 11:11 AM2h 11mdayScheduled PM — oil change and filter replacement

T50 Central Granulator #50

Joliet Production Site

Scheduled MaintenanceFeb 27 10:40 AM52mdayOperator break — no coverage

GP Portable Chiller #37

Grand Rapids Plant

Scheduled MaintenanceFeb 27 04:13 AM4h 44mnightColor change — purging system

GP Portable Chiller #13

Louisville Assembly

Mold ChangeFeb 27 03:20 AM5h 33mnightElectrical fault traced to loose connection on contactor

TS5 TCU #8

Elkhart Production Center

Quality HoldFeb 27 03:19 AM6h 1mnightCleaned material buildup in feed throat

VTC Plus Conveying System #3

Elkhart Production Center

Mold ChangeFeb 27 02:46 AM1h 42mnightElectrical fault traced to loose connection on contactor

LoadMaster Dryer #20

Louisville Assembly

Electrical FaultFeb 27 02:01 AM1h 35mnightScheduled PM — oil change and filter replacement

T50 Central Granulator #47

Racine Extrusion Facility

Scheduled MaintenanceFeb 26 10:55 PM2h 25meveningCleaned material buildup in feed throat

EcoFlow Energy Monitor #44

Racine Extrusion Facility

Electrical FaultFeb 26 10:25 PM1h 36meveningReplaced worn bearing on main drive

BD Batch Blender #17

Louisville Assembly

Mechanical FailureFeb 26 08:01 PM2h 27meveningColor change — purging system

GP Portable Chiller #29

Dayton Manufacturing

Quality HoldFeb 26 07:27 PM4h 12meveningOperator break — no coverage

BD Batch Blender #48

Racine Extrusion Facility

Operator UnavailableFeb 26 04:48 PM7h 54meveningOperator break — no coverage

EcoFlow Energy Monitor #52

Joliet Production Site

Mold ChangeFeb 26 04:12 PM6h 30meveningCleaned material buildup in feed throat

Accumeter Ovation Continuous Blender #19

Louisville Assembly

Mold ChangeFeb 26 01:45 PM3h 59mdayColor change — purging system

T50 Central Granulator #49

Joliet Production Site

Scheduled MaintenanceFeb 26 10:52 AM3h 5mdayCleaned material buildup in feed throat

VTC Plus Conveying System #11

Elkhart Production Center

Material ChangeoverFeb 26 07:58 AM7h 40mnight

HE Central Chiller #27

Dayton Manufacturing

Material ChangeoverFeb 26 07:50 AM4h 55mnightOperator break — no coverage