Energy Monitoring
Power consumption and cost analysis
7-Day Total
171,364 kWh
7-Day Cost
$15423
@ $0.09/kWh
Avg Daily
27,245 kWh
Peak Hour
15:00
Highest avg consumption
Daily Consumption (30d)
Hourly Profile (7d avg)
Consumption by Device (7d)
| Device | Location | kWh | Cost | % of Total |
|---|---|---|---|---|
| VTC Plus Conveying System #16 | Louisville Assembly | 3,487.3 | $313.92 | 2.0% |
| Accumeter Ovation Continuous Blender #51 | Joliet Production Site | 3,440.4 | $309.57 | 2.0% |
| EcoFlow Energy Monitor #24 | Dayton Manufacturing | 3,423.7 | $308.10 | 2.0% |
| T50 Central Granulator #50 | Joliet Production Site | 3,418.4 | $307.71 | 2.0% |
| LoadMaster Dryer #22 | Dayton Manufacturing | 3,404.1 | $306.31 | 2.0% |
| T50 Central Granulator #49 | Joliet Production Site | 3,393.8 | $305.43 | 2.0% |
| GP Portable Chiller #32 | Grand Rapids Plant | 3,368.3 | $303.24 | 2.0% |
| GP Portable Chiller #14 | Louisville Assembly | 3,346.4 | $301.18 | 2.0% |
| EcoFlow Energy Monitor #6 | Elkhart Production Center | 3,345.3 | $301.09 | 2.0% |
| HE Central Chiller #23 | Dayton Manufacturing | 3,342.2 | $300.81 | 2.0% |
| TS5 TCU #38 | Grand Rapids Plant | 3,339.4 | $300.55 | 1.9% |
| BD Batch Blender #17 | Louisville Assembly | 3,338.4 | $300.48 | 1.9% |
| T50 Central Granulator #47 | Racine Extrusion Facility | 3,336.8 | $300.35 | 1.9% |
| Accumeter Ovation Continuous Blender #33 | Grand Rapids Plant | 3,336 | $300.22 | 1.9% |
| VTC Plus Conveying System #11 | Elkhart Production Center | 3,329.7 | $299.72 | 1.9% |
| T50 Central Granulator #46 | Racine Extrusion Facility | 3,325.3 | $299.30 | 1.9% |
| VTC Plus Conveying System #3 | Elkhart Production Center | 3,325.1 | $299.26 | 1.9% |
| BD Batch Blender #43 | Racine Extrusion Facility | 3,321.7 | $298.96 | 1.9% |
| Accumeter Ovation Continuous Blender #19 | Louisville Assembly | 3,316.1 | $298.45 | 1.9% |
| TS5 TCU #42 | Racine Extrusion Facility | 3,313.6 | $298.24 | 1.9% |