OEE Dashboard
7-day Overall Equipment Effectiveness
OEE
36%
Overall
Availability
43%
Uptime ratio
Performance
87%
Speed efficiency
Quality
96%
First pass yield
OEE Gauge
Downtime by Shift
Equipment Performance (7d)
| Device | Category | Location | Downtime | Availability | Alarms |
|---|---|---|---|---|---|
| BD Batch Blender #48 | Blending | Racine Extrusion Facility | 427h | -154% | 10 |
| T50 Central Granulator #49 | Size Reduction | Joliet Production Site | 375h | -123% | 2 |
| VTC Plus Conveying System #11 | Conveying | Elkhart Production Center | 366h | -118% | 8 |
| GP Portable Chiller #13 | Temperature | Louisville Assembly | 282h | -68% | 5 |
| VTC Plus Conveying System #34 | Conveying | Grand Rapids Plant | 251h | -50% | 6 |
| HE Central Chiller #27 | Temperature | Dayton Manufacturing | 233h | -39% | 6 |
| EcoFlow Energy Monitor #24 | Energy | Dayton Manufacturing | 226h | -34% | 2 |
| Accumeter Ovation Continuous Blender #51 | Blending | Joliet Production Site | 222h | -32% | 5 |
| TrueTemp TCU #18 | Temperature | Louisville Assembly | 214h | -27% | 11 |
| GH-F Gravimetric Feeder #9 | Conveying | Elkhart Production Center | 194h | -15% | 0 |
| VTC Plus Conveying System #39 | Conveying | Grand Rapids Plant | 176h | -4% | 4 |
| T50 Central Granulator #47 | Size Reduction | Racine Extrusion Facility | 169h | 0% | 3 |
| TS5 TCU #8 | Temperature | Elkhart Production Center | 150h | 11% | 6 |
| GP Portable Chiller #14 | Temperature | Louisville Assembly | 123h | 27% | 4 |
| T50 Central Granulator #1 | Size Reduction | Elkhart Production Center | 120h | 29% | 6 |
| VTC Plus Conveying System #35 | Conveying | Grand Rapids Plant | 120h | 29% | 2 |
| EcoFlow Energy Monitor #52 | Energy | Joliet Production Site | 117h | 30% | 3 |
| Accumeter Ovation Continuous Blender #19 | Blending | Louisville Assembly | 115h | 31% | 3 |
| T50 Central Granulator #46 | Size Reduction | Racine Extrusion Facility | 108h | 36% | 5 |
| VTC Plus Conveying System #16 | Conveying | Louisville Assembly | 101h | 40% | 1 |